Halvorsen Build Co.

Services

Preconstruction, construction management, design-build and general contracting for commercial, multifamily, healthcare, education, industrial and hospitality buildings.

Four ways to hire a builder.

The difference between them is when the price gets fixed and who carries the design. The bar under each shows how far through design the number is locked.

  1. 01

    Preconstruction

    Owners with a site and a budget, before or during design.

    We price the design as it develops — massing, systems, three structural options — so every decision is made with its cost on the table.

    A budget you can take to the bank, and a design that fits it.

    Priced from the first sketch SketchFull drawings
  2. 02

    CM at Risk

    Complex buildings where the owner keeps their own architect.

    We join during design, run preconstruction, then commit to a guaranteed maximum price and build to it. Savings under the GMP go back to the owner.

    One contract with a ceiling, open books, and shared savings.

    Price fixed at 60% design SketchFull drawings
  3. 03

    Design-Build

    Owners who want one party responsible for design and construction.

    We hire the architect and engineers and carry the design risk. Design and construction overlap, which is where the schedule comes from.

    One point of responsibility and the fastest route to opening day.

    Price fixed at 30% design SketchFull drawings
  4. 04

    General Contracting

    Fully designed projects going out to tender.

    Complete drawings in, a lump-sum bid out. We buy out the trades, run the site and hand over on the date in the contract.

    A fixed price on a finished design.

    Price fixed at 100% design SketchFull drawings

What would it cost, and how long would it take?

The same square-foot ranges our preconstruction team starts from before there are drawings. Move the sliders; the building moves with them.

What are you building?
Finish

Construction cost, ballpark

$30.8M – $45.4M

$285–$420 per sq ft · about 15–20 months on site

Send this to our estimators

Construction cost only, at Colorado Front Range prices: excludes land, design fees, permits, furniture and financing. A real number needs drawings — this one is for planning.