Library, study rooms and a 400-seat hall under a single triangulated canopy. The canopy steel was pre-assembled in modules on site and lifted in over a single three-week window during the summer break.
What we delivered
- Modular canopy lift in a three-week summer window
- Phased site logistics around an open campus
- Mass-timber decking
